In an industrial city in Africa, a large industrial park is under construction with the aim of building a power station.
Under the expert guidance of Tide Power's technical engineering team, 7 generator sets equipped with original German MWM engines are being strategically placed and interconnected to operate seamlessly in parallel. This critical deployment marks a significant milestone in the development of the industrial park's electrical infrastructure, ensuring a reliable and uninterrupted power supply to support industrial production needs.
Based on the power requirements, Tide Power has selected the German original MWM engine to design 7 gas generator sets, adopting parallel island operation to continuously meet the surrounding power demand with strong performance and characteristics such as low emissions, high efficiency and high safety. The selected LEROY-SOMER double-bearing high-voltage generator can efficiently ensure the safety of long-distance power transmission. The replacement of the traditional water tank heat dissipation with plate heat exchangers has a compact structure, greatly improving the spatial flexibility of the unit.
As a professional power solution provider, Tide Power has a comprehensive global supply chain system and service network, with professional talent teams from international offices in China, Southeast Asia, Australia and more, serving more than 80 countries and regions worldwide. Adhering to the corporate philosophy of contributing to the global power industry and with green and low-carbon development goals, we look forward to making more positive contributions to promoting energy transformation and sustainable development in the region after the power plant construction is completed.